Recent Projects

Automotive Parts Manufacturer:
Paramount increased overall time savings at client’s facility by 67%.
Tasks taking client’s personnel 35 minutes to complete were accomplished in 12 minutes by Paramount workers.

Paramount performed with a 0% defective rate.
Client found it necessary to purchase additional air compressors due to the unwavering work ethic of Paramount’s employees

Tire Manufacturer:
Paramount staffed multiple facilities performing all aspects of tire building. Project also required maintenance personnel. Successfully operated for 14 weeks.

Steel Company:
Paramount set a production record on client’s hot dip galvanizing line which had been unmatched in the 49 year history of operation.  Client’s net sales for 2006 were a record $6,069.0 million on shipments of 6,168,600 tons.  Paramount employees were operating in the client’s largest facility  340 days of this record year.

Agricultural Equipment Manufacturer:
Paramount employees set numerous quality and production records at client’s operations.  Client’s confidence in Paramount prompted the launch of a new product.  Paramount significantly exceeded expected product output at previously unheard of quality ratings.

Paramount performed advance planning and support that successfully helped avoid labor shortages at other client locations.

Agricultural Equipment Parts Distribution Center:
Cold re-start of the largest parts Distribution Center in the client’s company. Ramped-up quickly in response to the busy springtime season, using approximately 60% of the personnel ordinarily doing the work.

Airplane Manufacturer:
Assisted in two projects, each requiring significant advance planning to achieve desired result. Provided CDL drivers and logistic support for each, and FAA designated engineering representatives on first.

Aluminum Casting Company:
Provided personnel for aluminum casting operation during labor shortage. All personnel performed without incident and at or above established standards.

Truck and Tractor Body Manufacturer:
Launched a successful deployment without advance planning for 85 highly skilled welders, who worked on aluminum, stainless steel, and both hot and cold rolled steel. Project lasted 15 weeks. Operations continued throughout the project with little or no disruption.

East Coast Grocery Chain:
Assisted in advance planning for a large scale distribution operation anticipating a labor shortage. Helped with all facets of operations including review of cross dock options, logistics, and staffing.

Paramount was asked to assist with placement of temporary staffing at multiple locations.

This client in particular had multiple experiences trying to do this prior to engaging Paramount with poor results. Client credits Paramount as the difference in this project being successful.

Clothing Manufacturer and Distributor:
Paramount operated four distribution centers using local and national labor forces.   

Mining Company:
Paramount deployed highly skilled maintenance, welders, heavy equipment operators and production personnel to the client’s metal mining and smelting operations. Paramount deployed several hundred workers, in the most arduous conditions, who worked and produced well above the established standards.

 


ABOUT   SERVICES   EXPERIENCE   CONTACT   HOME

© 2010 Paramount Consulting  All Rights Reserved